As you can see I've used a wooden framed sub floor off the concrete. Boards a 165mm x 22mm French Oak in random lengths. These are from trees grown locally and have been stacked upstairs for the past 2 years
Floor boards laid through to the kitchen above. You get the general idea, below. The board are all traditionally face nailed by hand with cut floor brads. These I had to import as they don't sell them in France any more as far as I can tell?
I need to finish off the bottom of the stairs with the last step from the landing.
And the beams. They look nice now but they were a swine to do.
Needless to say i'm tired now!